| 2016 | Replacement of the Oil Metering Facilities with associated works at ES Sider Terminal | Libya | Waha Oil Company (Ex Oasis Oil Company) | ||
| 2016 | Maintenance of 500 M3 Light Fuel Oil Tankwith Related Facilities and Fire Fighting System at Mitiga Power Plant | Libya | GECOL - General electricity Compnay of Lybia | ||
| 2016 | Gialo Water Disposal System | Gialo Oilfield | Libya | Waha Oil Company (Ex Oasis Oil Company) | |
| 2014 | The replacement/installation of liner at Evaporation Pond at Ras Lanuf Export Terminal | Ras Lanuf Tank Farm | Libya | Harouge (VEBA) Oil OperationsB.V. Libyan Branch | |
| 2012 | Cooling system piping alternation for Tanks 210 CT1/2, BT1, NT1/2, KT4/5/6, GT9/10/11/12 / ST1/2/3/4 | Ras Lanuf | Libya | LERCO – Libyan Emirates RefineryCompany | |
| 2012 | Alternative tank for storing kerosene products; Contract No. 0627 | Ras Lanuf | Libya | LERCO – Libyan Emirates RefineryCompany | |
| 2010 | Dahab Highline to Feed NewProduction Wells PN 1222A; (11 km new 34.5 KV highline) | Zuetina Oil Terminal | Libya | ZUEITINA Oil Company | |
| 2010 | Power Supply for 2 CathodicProtection Stations | Zuetina Oil Terminal | Libya | ZUEITINA Oil Company | |
| 2010 | Sea Water Intake: Replacement of8” Hypochlorite Lines and Maintenance of 144” SWI Pipes | Ras Lanuf | Libya | RASCO - Ras Lanuf Oil &GasProcessing Company, Inc. | |
| 2010 | AGOCO Tobruk - Installation ofFoam Extinguishing System on Tanks 805 & 842 and Fire Protection Systemon the Floating Roof Tanks at Tobruk Refinery Project K-52 | Tobruk | Libya | AGOCO - Arabian Gulf Oil Company | |
| 2010 | Supply and Installation of 15/30kV Tank Farm/Terminal Feeder Cables and Tank Farm Switchgears; Contract No.2008-39 + CO – Main Power Supply 5 MVA TS (30 /12.5 kV) at Tank Farm forentire HOO R/L. | Ras Lanuf Oil Terminal | Libya | Harouge (VEBA) Oil OperationsB.V. Libyan Branch | Engineering, design, supply andinstallation of 15/30 kV Tank Farm/Terminal Feeder Cablesand Tank Farm Switchgears |
| 2010 | Replace Main Distribution Board; Ras Lanuf Terminal; – SERVICE ORDERNo. 1- Terminal MV Underground Cables | Ras Lanuf Oil Terminal | Libya | Harouge (VEBA) Oil Operations B.V. Libyan Branch | Replacement of Main Distribution board at Ras Lanuf Terminal |
| 2010 | Cleaning and Refurbishment Oil Tank 2100-GT-11 | Ras Lanuf | Libya | LERCO – Libyan Emirates Oil Refining Company | Emptying, Cleaning and Refurbishment of Heavy Gas Oil Tank 2100-GT-11 |
| 2009 | General Reconstruction Of Main Facilities For Liquid Fuel Transfer From Ground To Oil River Barge | Oil Refinery Bosanski Brod | Bosnia & Hercegovina | Zarubezneftestrojmontaz O.O.O. Moskva, Russia & Oil Refinery Bosanski Brod, Bosnia & Hercegovina | Design, Engineering & Construction Of Pipe Lines Transfer Sistem, Custodi Transfer Metering Skids, Firefighting Sistem, Oil Barge On River Sava Including Conection Between. |
| 2009 | Cleaning of HC111 | Nafura | Libya | WINTERSHALL Libyan Branch | Cleaningof HC 111 exchange unit with high pressure pump. |
| 2009 | Installation of fire fightingsystem | Tobruk | Libya | Arabian Gulf Oil Co. | Installation of foamextinguishing system on tanks and fire protection systemon floating roof tank |
| 2009 | Upgrade of MV switchgear relayprotection system | Oil field 103A & 103B | Libya | Zueitina OilCo. Libya | Installation of MV switchgearrelay protection system and monitoring control equipment. |
| 2009 | Works on underground facilitiesat Tank Farm | Ras Lanuf | Libya | Harouge Oil Operations | Maintenance and servicing ofunderground facilities. |
| 2008 | Dahab highline | Zueitina | Libya | Zueitina OilCo. Libya | Engineering and installation ofMW power supply (9km new 34,5 KV high line)to feed eight new productionwells. |
| 2008 | Main Distribution Board, RasLanuf Terminal - Replacement | Ras Lanuf | Libya | Harouge Oil Operations | Supply and Installation of15/30kV Tank Farm/Terminal Feeder Cables and Tank Farm switchgears. |
| 2007 | Ethylene plant 8th turnaround | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Turnaround services, instrumentand NDT insp. specialist . |
| 2007 | Glass reinforced pipesreplacement | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Glass reinforced pipesreplacement |
| 2007 | LPG plant terminal | Zueitina | Libya | Zueitina OilCo. Libya | Turnaround services, instrumentspecialist, pipe line specialist. |
| 2007 | Maintenance of the facilities atAmal field | Amal Field | Libya | Arabian Gulf Oil Co. | Construction works andengineering; supply of material. |
| 2007 | Polyethylene plant 3rdturnaround | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Overhauling of rotary equipment,engaged 35 specialists. |
| 2007 | Replacement of main distributionboard | Ras Lanuf | Libya | VebaOil Co. Libya | Replacement of main distributionboard, installation of new equipment. |
| 2006 | Construction of a new fire watertank | Sahabi Field | Libya | Arabian Gulf Oil Co. | Main design and construction ofa 5000 BBLS tank. |
| 2006 | Reconstruction of oil tank | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Re-bottoming and annular Ringreconstruction. |
| 2005 | Cleaning and refurbishment offuel oil tank | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Cleaning and refurbishment offuel oil tank. |
| 2005 | Dry Slop Oil tank | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Re-bottoming and annular platesreplacement. |
| 2005 | Installation of Runway Lightingsystem , Ed Dib Airport | Ghani Field | Libya | VebaOil Co. Libya | Main design, completeconstruction and start up, Fire detection system installation. |
| 2005 | Pump stations | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Servicing of pump stations. |
| 2004 | Ethylene plant 7th turnaround | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Provision of 239 highly skill;mechanics, rotating equipment and instrumentation specialist, pipe fitters,welders and NDT inspectors. |
| 2004 | Polyethylene Plant 2ndturnaround | Ras Lanuf | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Overhauling of mechanical,electrical & instrumentation equipment and inspection. 55 highlyspecialized technicians engaged |
| 2002 | Operation and maintenanceservices at oil fields & terminal | Multiple Sites | Libya | Zueitina OilCo. Libya | Technical assistance servicesfor operation and maintenance. |
| 2002 | Shurtan project | Karshi | Uzbekistan | AbbLumus Global, USA | Management and processsupervising services for ethylene & polyethylene plant and utility. |
| 2001 | Operation services atPolyethylene plant & polymer handling | Film plant | Libya | Ras Lanuf Oil & GasProcessing Co. Inc | Technical assistance servicesfor operation. |
| 1999 | Maintenance services at oilfields in association with Energoinvest Co. | Multiple Sites | Libya | Arabian Gulf Oil Co. | Technical assistance servicesfor maintenance. |
| 1998 | FCC plant | Plock | Poland | Technipetrol,Plock, Poland and I.C.R.I. s.p.a., Rome Italy | Commissioning of instrumentationand process start-up of FCC plant. |
| 1998 | Oil refineries and Petrochemicalcomplex | Port Harcourt | Nigeria | Comerintltd., Nigeria | Mechanical maintenance services. |
| 1997 | Ammonia plant | Urumqui | China | Technimont s.p.a. Italy and E.C.O.S. Ltd., England | Commissioning start-up and process back-up services. |
| 1997 | Polypropylene plant | Ufa | Russia | Technimont pp, Ufa Russia and I.C.R.I. s.p.a., Rome, Italy | Instrumentation back- up services. |
| 1996 | Ethylene plant | Canton | China | Technimont s.p.a. and I.C.R.I. s.p.a., Rome, Italy | Commissioning of instrumentation including DCS and software programming, process start-up, initial operation and back-up of instrumentation and operation services. |
| 1996 | Fibrex S.A. H2 and Co2 plant Fibrex S.A. H2 and Co2 plant | Piatru Niemc | Romania | Kinetics Technology International s.p.a., Rome, Italy and WTI, Ireland | NDT equipment inspection. |
| 1996 | Petrochemical plant | Al Shuaiba | Kuwait | Kinetics Technology International s.p.a., Rome, Italy and WTI, Ireland | Construction and commissioning of plant's Furnaces section |
| 1996 | Polypropylene plant | Dalian | China | Technimont s.p.a. and I.C.R.I. s.p.a., Rome, Italy | Commissioning of instrumentation including DCS and software programming, process start-up, initial operationand back-up of instrumentation and operation services. |
| 1996 | Power plant | Omar | Syria | Technipetrol s.p.a,. Rome, Italy and I.C.R.I s.p.a., Rome, Italy | Classroom and on job training of client's electrical staff. |
| 1996 | Power plant | Omar | Syria | Technipetrol s.p.a., Rome, Italy and I.C.R.I s.p.a., Rome, Italy | Commissioning, start-up and back-up of mechanical and electrical services. |
| 1996 | Steel Factory | ? | Thailand | Daneco s.p.a. and I.C.R.I s.p.a., Rome, Italy | LV electric supervision and SIMATIC software programming. |